土木工程资料网 - 做最好的土木行业资料下载网站!本站永久唯一网址:www.tmgc.net

土木工程网 > 建筑 > 资料下载页

地震区预制混凝土剪力墙连接(8页).pdf下载

  • 大小:1.95KB
  • 上传人:剩蛋姐
  • 文件格式:..pdf
  • 类别:建筑
  • 点击: 3次
  • 更新时间:2020-02-02
  • 说明:下载"地震区预制混凝土剪力墙连接(8页)"的电子版。
  • 安全检测: 360安全卫士 360杀毒 电脑管家
进入下载地址列表
  • 内容介绍

土木工程资料网会员[www.tmgc.net]为您带来"地震区预制混凝土剪力墙连接(8页)"这份资料,本页面最后更新时间为:2020-02-02 14:55 ,如果你需要一份这样的资料作为工作学习参考工具,那么就赶紧下载下来进行查阅使用吧!

文件"地震区预制混凝土剪力墙连接(8页)"是由土木工程资料网会员剩蛋姐发布

下载地址

  • 列表
  • 进入下载地址列表
  • 进入下载地址列表

地震区预制混凝土剪力墙连接(8页)相关专题列表

随机推荐

热门下载

全站点击下载排行

更多资料

地震区预制混凝土剪力墙连接(8页)专题简介

↓ 下方列表中有更多相似的文章哟!
    地震区预制混凝土剪力墙连接 地震区预制混凝土剪力墙连接

    土木工程资料网提供资料下载,包括:建筑规范、施工设计图纸、方案、范本/考试资料、建筑图等资料,有pdf,word,ppt,CAD文件。地震区预制混凝土剪力墙连接(8页)的结果最多显示10条记录,如果需要查询更多,请使用网站顶部的搜索功能。

    PRECAST CONCRETE SHEAR WALL CONNECTIONS
    FOR SEISMIC ZONES
    K.A. Soudki(l) and S.H. Rizkalla(2)
    ABSTRACT
    The precast concrete shear wall system is becoming very popular in North America for low,
    medium, and highrise construction due to the economical advantages possible with the ease and
    speed of assembly, and the high quality of the precast panels. The connections between panels
    are extremely important since they affect both the speed of erection and the overall integrity of
    the structure. This paper presents the results of the last two phases of a six-year research program
    conducted to investigate the behaviour and the capacity of fIfteen connection configurations used
    for precast load-bearing shear wall panels subjected to monotonic shear loading and large reversed
    cyclic loading conditions.
    Connection configurations include dry-packed plain surface, dry-packed plain surface with
    continuity reinforcement, dry-packed with two types of mechanical shear connectors in addition
    to the continuity bars, dry-packed with post-tensioning, and two types of dry-packed multiple shear
    keys. The research also include connections which support hollow-core slab with and without
    post-tensioning. The performance of new innovative connections, such as partial or complete
    debonding of the reinforcement continuity and the use of energy dissipating mechanical
    connections for the continuity reinforcement, were also examined. Three different levels of load
    normal to the connection to simulate the effects of gravity load were used.
    The research fmdings of this investigation were implemented in the design and construction
    of three 32-stories apartment buildings in Winnipeg, Manitoba. The connections considered in this
    study provided significant savings in construction time and cost.
    1 Doctoral Candidate, Civil Engineering Departmeht, University of Manitoba
    2 Associate Dean of Engineering and Professor, University of Manitoba